$50+ Orders Ship Free Worldwide
1903 Rambler Model F 4 Door Power Window Conversion Kit - Flat Glass with Switches & Wiring Harness - Easy DIY Installation for Classic Car Restoration
$536.8
$976
Safe 45%
1903 Rambler Model F 4 Door Power Window Conversion Kit - Flat Glass with Switches & Wiring Harness - Easy DIY Installation for Classic Car Restoration 1903 Rambler Model F 4 Door Power Window Conversion Kit - Flat Glass with Switches & Wiring Harness - Easy DIY Installation for Classic Car Restoration 1903 Rambler Model F 4 Door Power Window Conversion Kit - Flat Glass with Switches & Wiring Harness - Easy DIY Installation for Classic Car Restoration 1903 Rambler Model F 4 Door Power Window Conversion Kit - Flat Glass with Switches & Wiring Harness - Easy DIY Installation for Classic Car Restoration 1903 Rambler Model F 4 Door Power Window Conversion Kit - Flat Glass with Switches & Wiring Harness - Easy DIY Installation for Classic Car Restoration 1903 Rambler Model F 4 Door Power Window Conversion Kit - Flat Glass with Switches & Wiring Harness - Easy DIY Installation for Classic Car Restoration 1903 Rambler Model F 4 Door Power Window Conversion Kit - Flat Glass with Switches & Wiring Harness - Easy DIY Installation for Classic Car Restoration 1903 Rambler Model F 4 Door Power Window Conversion Kit - Flat Glass with Switches & Wiring Harness - Easy DIY Installation for Classic Car Restoration 1903 Rambler Model F 4 Door Power Window Conversion Kit - Flat Glass with Switches & Wiring Harness - Easy DIY Installation for Classic Car Restoration
1903 Rambler Model F 4 Door Power Window Conversion Kit - Flat Glass with Switches & Wiring Harness - Easy DIY Installation for Classic Car Restoration
1903 Rambler Model F 4 Door Power Window Conversion Kit - Flat Glass with Switches & Wiring Harness - Easy DIY Installation for Classic Car Restoration
1903 Rambler Model F 4 Door Power Window Conversion Kit - Flat Glass with Switches & Wiring Harness - Easy DIY Installation for Classic Car Restoration
1903 Rambler Model F 4 Door Power Window Conversion Kit - Flat Glass with Switches & Wiring Harness - Easy DIY Installation for Classic Car Restoration
1903 Rambler Model F 4 Door Power Window Conversion Kit - Flat Glass with Switches & Wiring Harness - Easy DIY Installation for Classic Car Restoration
1903 Rambler Model F 4 Door Power Window Conversion Kit - Flat Glass with Switches & Wiring Harness - Easy DIY Installation for Classic Car Restoration
1903 Rambler Model F 4 Door Power Window Conversion Kit - Flat Glass with Switches & Wiring Harness - Easy DIY Installation for Classic Car Restoration
1903 Rambler Model F 4 Door Power Window Conversion Kit - Flat Glass with Switches & Wiring Harness - Easy DIY Installation for Classic Car Restoration
1903 Rambler Model F 4 Door Power Window Conversion Kit - Flat Glass with Switches & Wiring Harness - Easy DIY Installation for Classic Car Restoration
1903 Rambler Model F 4 Door Power Window Conversion Kit - Flat Glass with Switches & Wiring Harness - Easy DIY Installation for Classic Car Restoration
$536.8
$976
45% Off
Quantity:
Delivery & Return: Free shipping on all orders over $50
Estimated Delivery: 10-15 days international
30 people viewing this product right now!
SKU: 90625244
Guranteed safe checkout
amex
paypal
discover
mastercard
visa
apple pay
shop
AutoLoc's 1903 Rambler Model F 4-door flat-glass power window conversion kit with switches and wiring harness allows you to convert your old flat glass windows into a completely new power system. Because of their high-torque motors and custom mounting brackets, AutoLoc's Power Windows are perfect for 1903 Rambler Model F that have never had power windows.

The revolutionary Super Glide window design, high-torque motors, reinforced guide tracks, and adjustable window bases, ensure quick, quiet, and dependable operation for the life of your vehicle. Glass fits tightly into clamps and operates on its own track. These attach very tightly, so they do not allow the glass to sway or wobble. Also works great with narrow doors.


***Please Note***

Professional installation recommended, some modifications may be required to work with your vehicle. Can be cut to fit and mounted in various positions.

Complete kit includes 1903 Rambler Model F 4 door power window kit with 7 switches, wiring, and installation hardware as shown. Additional switch cases and bezel available (SOLD SEPERATELY).

Includes Detailed Instructions, Free Tech Support, and a Limited Lifetime Warranty.

Autoloc offers a variety of plug and play switches, frames, and cases to pick from, allowing you to customize or match a factory look. This kit is also available in 2 and 4-door kits with our standard switch set. Click through our site for the other options on this kit. This kit can be upgraded to remote control operation using any of AutoLoc's keyless entry units or window controllers.

More

For all orders exceeding a value of 100USD shipping is offered for free.

Returns will be accepted for up to 10 days of Customer’s receipt or tracking number on unworn items. You, as a Customer, are obliged to inform us via email before you return the item.

Otherwise, standard shipping charges apply. Check out our delivery Terms & Conditions for more details.


You May Also Like